Frank Tucker Ltd were awarded the contract located at Harrogate District Hospital to construct a concrete pad and other associated works for the new MRI portable scanning unit.
The general scope of work was:
- Excavation to formation and removal of material
- Installation of new kerb lines
- Installation of associated drainage
- Installation of concrete footings for new retaining wall
- Alteration of existing manhole chambers
- Installation of structural reinforced concrete pad
- Macadam surfacing
- Final landscaping
Frank Tucker Ltd have worked alongside I&G site team providing engineering solutions to aid in the construction of this project. All work was completed in March 2014.