Frank Tucker Ltd were awarded the contract to prepare and surface existing car parks and access roads at Nantwich Cricket Club.
The general scope of work was:
Prepare existing surfaces for surfacing
Alterations to existing iron work
Application of bituminous tack coat
Provision of new surfacing
Over 1200m² of surfacing was carried out within the day and a quality product produced.