Frank Tucker Ltd were awarded the contract located at Harrogate District Hospital to construct a concrete pad and other associated works for the new MRI portable scanning unit.

The general scope of work was:

Excavation to formation and removal of material
Installation of new kerb lines
Installation of associated drainage
Installation of concrete footings for new retaining wall
Alteration of existing manhole chambers
Installation of structural reinforced concrete pad
Macadam surfacing
Final landscaping

Frank Tucker Ltd have worked alongside I&G site team providing engineering solutions to aid in the construction of this project. All work was completed in March 2014.