Call: 01274 681221|franktucker@franktucker.co.uk

Construction

Dewsbury Bus Station

Frank Tucker was recently won a contract for a client in Dewsbury to pull up existing paving slabs located at the Dewsbury Bus Station due to settlement causing trip hazards for the public. Trim existing sub-base and then reinstate with tarmacadam creating a maintenance free surface.

I&G – Harrogate District Hospital

Frank Tucker Ltd were awarded the contract located at Harrogate District Hospital to construct a concrete pad and other associated works for the new MRI portable scanning unit.

The general scope of work was:

Excavation to formation and removal of material
Installation of new kerb lines
Installation of associated drainage
Installation of concrete footings for new retaining wall
Alteration of existing manhole chambers
Installation of structural reinforced concrete pad
Macadam surfacing
Final landscaping

Frank Tucker Ltd have worked alongside I&G site team providing engineering solutions to aid in the construction of this project. All work was completed in March 2014.

High Park School – Bradford

Frank Tucker Ltd were awarded the contract located at High Park School, Bradford by FMP joint venture group to complete the surfacing to two schools in close proximity. The total surfacing package was in excess of £180,000.

The general scope of work was:

Complete areas of binder course left by other contractors.
Provide surface courses to playgrounds and footpaths
Complete the construction of access roads and car parks
Carryout necessary road planning in preparation for surfacing

Due to the short notice Frank Tucker Ltd had to develop sound working relationships and practices with a new client very quickly in order that the contract ran smoothly and was ultimately handed over on time. This was achieved by our experienced contracts team and in excess of 1300t material was laid over a 3 week period to the satisfaction of our client.